Current Project
Classroom Complex

The classroom complex will add nine new classrooms, a student lounge, and loft. With high ceilings, an open floorplan, and 8ft glass walls, the complex will carry the bright, open design of our school forward, while providing dedicated spaces for students in our High School from Grades 9 to 12.

Overview shot of Meadowridge School with new building construction site

Distinctly warm and inviting, with spaces for both collaboration and quiet contemplation, the classrooms and common spaces will support students in whatever the day may bring.

Thank you to our donors, who have made the construction of the this building possible.

Architectural Drawings of a nine-classroom building

Building Features

1120 square metres over two-stories 

Nine classrooms including a science lab and science classroom

Student Lounge (main floor)

Student Loft (upper floor)

Large windows and glass wall partitions

Open concept design

Connected to main campus through east Cafeteria doors


Building Updates

July 23, 2019

Almost completed two-story building from the outside

 

In construction well-lit science classroom

 


May 2, 2019

The construction of the Classroom Complex continues to progress. A new boiler has been added in our current mechanical room which will feed the new addition and other mechanical work is ongoing, including two new air handling units which will be installed once the roofing work, which is currently well underway, is complete.

Interior cement building construction zone looking out at greenery

Internal framing of walls and doorways is in progress and the stairs have been installed inside the South entrance. Fume hoods for the Science labs and glass sliding partition walls have been ordered and We're now in the process of discussing colours, finishings and furnishings with the project designer.  Lots of work still has to be done but we're excited about how it's shaping up!

Interior stairwell being built

January 31, 2019

All the walls for our Classroom Complex are up. The construction team did a great job and it only took a couple of days.


January 28, 2019

The complex walls are going up! Using a large crane the cement walls will only take a couple of days to be complete.

Large crane lifting cement wall for building construction

August 2, 2018

Construction on the Classroom Complex has begun!

Excavator breaking ground