Classroom Complex

The classroom complex will add nine new classrooms, a student lounge, and loft. With high ceilings, an open floorplan, and 8ft glass walls, the complex will carry the bright, open design of our school forward, while providing dedicated spaces for students in our High School from Grades 9 to 12.

Overview shot of Meadowridge School with new building construction site

Distinctly warm and inviting, with spaces for both collaboration and quiet contemplation, the classrooms and common spaces will support students in whatever the day may bring.

Supported by a number of generous donors to date, this complex is estimated to be completed for Fall 2019.

Architectural Drawings of a nine-classroom building

Building Features

1120 square metres over two-stories 

Nine classrooms including a science lab and science classroom

Student Lounge (main floor)

Student Loft (upper floor)

Large windows and glass wall partitions

Open concept design

Connected to main campus through east Cafeteria doors


Building Updates

January 31, 2019

All the walls for our Classroom Complex are up. The construction team did a great job and it only took a couple of days.


January 28, 2019

The complex walls are going up! Using a large crane the cement walls will only take a couple of days to be complete.

Large crane lifting cement wall for building construction

August 2, 2018

Construction on the Classroom Complex has begun!

Excavator breaking ground